Back
CMGL ASSET
ASSET DESCRIPTION
ASSET DESCRIPTION
Overview
Contained Material
Operations
Fleet
Energy
Economics
Access to Property
ASSET NAME
CMGL
ASSET TYPE
Exploration
Exploration METALS & MINERALS
Copper, Gold, Iron ore, Manganese, Niobium, Tantalum, Tin, Tungsten
SPECIFIC LOCATION
Maniema, République démocratique du Congo
CURRENT ASSET STATUS
  • Optioned to null
  • Paused
  • Seeking Financing - $null.00M - $null.00M for null% - null%
  • Seeking Partnership
CURRENT ASSET STATUS NOTES

In short, in our country and our company needs investors, we have lands that have a lot of minerals, but we do not have the opportunity and the technology to have a great production because in the majority we work through our physical strengths.

OWNERSHIP STRUCTURE
COMPANY NAMESTAKE %NOTES
Optionee CMGL 100
0
0
ASSET ACTIVITIES
ACTIVITYSTART DATEEND DATEPROGRESS
HISTORICAL OWNERSHIP
OWNERSHIPFROMTOCOMMENT
MINERAL RESOURCES AND RESERVES
Mineral Resources:
MetalMeasuredIndicatedInferredAttributable interests
TonnageGradeContainedCutOffTonnageGradeContainedCutOffTonnageGradeContainedContained
Copper 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0
Gold 0 k mt 0 g/t 0 k oz 0 g/t 0 k mt 0 g/t 0 k oz 0 g/t 0 k mt 0 g/t 0 k oz 0
Iron ore 0 k mt 0 % 0 k mt 0 % 0 k mt 0 % 0 k mt 0 % 0 k mt 0 % 0 k mt 0
Manganese 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0
Niobium 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0
Tantalum 0 k mt 0 g/t 0 k oz 0 g/t 0 k mt 0 g/t 0 k oz 0 g/t 0 k mt 0 g/t 0 k oz 0
Tin 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0
Tungsten 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0
Mineral Reserves:
MetalProvenProbableAttributable interests
TonnageGradeContainedCutOffTonnageGradeContainedCutOffContained
Copper 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0 % 0
Gold 0 k mt 0 g/t 0 k oz 0 g/t 0 k mt 0 g/t 0 k oz 0 g/t 0
Iron ore 0 k mt 0 % 0 k mt 0 % 0 k mt 0 % 0 k mt 0 % 0
Manganese 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0 % 0
Niobium 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0 % 0
Tantalum 0 k mt 0 g/t 0 k oz 0 g/t 0 k mt 0 g/t 0 k oz 0 g/t 0
Tin 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0 % 0
Tungsten 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0 % 0
TOTAL CASH COST PER GOLD OUNCE
Amount in millionsMiningProcessingAdminRoyaltiesTotal%
Fuel000000 %
Maintenance000000 %
Labour000000 %
Insurance000000 %
Royalities000000 %
Reagents000000 %
Explosives000000 %
Contractors/consultants000000 %
Other*000000 %
Total US$ millions000000 %
PRODUCTION
PRODUCTION CYCLE Annual 2026 Experiences Expectations
2025 Q1 Q2 Q3 Q4 2026 5 Year Avg Remaining LOM
00000000Capital Expenditures13
00000000Ore Tons Mined23
00000000Mill Feed - Ore Tons Processed33
00000000Copper (m lbs) Produced762
00000000Gold (k oz) Produced792
00000000Iron ore (k mt) Produced812
00000000Manganese (m lbs) Produced852
00000000Niobium (m lbs) Produced882
00000000Tantalum (k oz) Produced952
00000000Tin (m lbs) Produced962
00000000Tungsten (m lbs) Produced972
00000000Copper (m lbs) Sold761
00000000Gold (k oz) Sold791
00000000Iron ore (k mt) Sold811
00000000Manganese (m lbs) Sold851
00000000Niobium (m lbs) Sold881
00000000Tantalum (k oz) Sold951
00000000Tin (m lbs) Sold961
00000000Tungsten (m lbs) Sold971
00000000Copper Recovery (%)764
00000000Gold Recovery (%)794
00000000Iron ore Recovery (%)814
00000000Manganese Recovery (%)854
00000000Niobium Recovery (%)884
00000000Tantalum Recovery (%)954
00000000Tin Recovery (%)964
00000000Tungsten Recovery (%)974
00000000Cash Operating Cost43
00000000All - in Sustaining Costs53
00000000Strip Ratio – Waste:Ore63
ARTICULATED HAULERS
US METRIC
TRUCKSNo. OF TRUCKSNET POWER (HP)LOAD CAPACITY (tons)
MINING TRUCKS
US METRIC
TRUCKSNo. OF TRUCKSNET POWER (HP)LOAD CAPACITY (tons)
POWER DEMAND
ENERGY SOURCEENERGY TYPEAVAILABLE POWER (MW)US$ PER KWHCONTRACT #EXPIRATION DATE
POWER AND ENGINEERING
Power Usage: total MWh per year
Peak power demand MW
Environmental Impact Assessment, man hours
Engineering firms
Local firms
AFTER TAX & ROYALTY NET PRESENT VALUE
Initial Capital Cost Operating Expenses NVP Discount RatePayback periodAfter tax IRRCopper (lbs)Gold (oz)Iron ore (mt)Manganese (lbs)Niobium (lbs)Tantalum (oz)Tin (lbs)Tungsten (lbs)
Date of Assessment
Jun 5, 2026